Mach 1 Consulting
Mach 1 Consulting
Sample deliverable · NDA-safe
Book a free 20-min intro
M1 / 100
Sample deliverable

30/60/90 startup scaling plan

A sample deliverable format showing the structure and specificity of a typical 30/60/90 engagement. Every example here is sanitized and NDA-safe by design.

Document
Format 30 / 60 / 90
Engagement Scaling plan
Confidentiality NDA-safe sample
Horizon 90 days
Engagement
context

Client profile: [Redacted] C-Corp

Seed to Series A product team with early traction, aiming to scale from prototype to production while controlling infrastructure costs and reducing security risk.

Primary objective: ship a production-grade system and weekly execution cadence that scales cleanly from 0 to 100K MAU without emergency migrations.

Inputs needed (minimal)

  • Access to staging logs and metrics, or sanitized exports
  • Database schema snapshot or ERD, even a rough one
  • Top endpoints by traffic
  • Monthly spend breakdown by category
  • Threat model constraints: payments, uploads, OAuth, webhooks, admin
Executive
summary

The constraint we are solving

  • Hot-path latency with no instrumentation
  • Cost spikes from runaway queries, egress, and invocations
  • Data model debt, so analytics and discovery become guesswork
  • Auth and session risk: OAuth edge cases, cookie flags, CSRF
  • Shipping stalls with no repeatable weekly process

90-day outcomes: what done looks like

  1. Stable foundation: Postgres system of record, clear boundaries, predictable deploys
  2. Cost governance loop: drivers identified, budgets set, optimizations with measured ROI
  3. Discovery inputs: event schema plus aggregates for ranking and experimentation
  4. Security baseline: hardened auth and session surfaces with regression checks
  5. Operator cadence: weekly plan, ship, review loop with measurable progress
What you
actually get
  • Constraint map plus 30-day action plan: top levers with evidence
  • System map, current to target: services, boundaries, data flow
  • Backlog plus milestones: scoped phases and sequencing
  • Cost driver report: top spend categories plus mitigation plan
  • Security baseline: auth, OAuth, sessions, abuse controls
  • Delivery estimate ranges, so leadership can plan
Phased
plan
01 Days 0 to 7

Intake and baseline

Goal: establish reality — what is fragile, expensive, and risky — and define success metrics.

  • Architecture inventory and hot paths
  • Baseline p95 latency, error rates, spend drivers, and security surfaces
  • Decide guardrails: speed versus cost versus quality
02 Days 1 to 30

Stabilize and make it measurable

  • Observability foundation: logs, metrics, alerts
  • Data model sanity and migration discipline
  • Cost governance loop and quick wins
  • Security baseline hardening: auth, redirects, rate limits
  • Weekly shipping cadence with a decision log
03 Days 31 to 60

Build the growth-ready core

  • Events and analytics pipeline, lightweight and real
  • Discovery v1: heuristics first, measurable outcomes
  • Release process, rollback flow, runbooks
04 Days 61 to 90

Scale, de-risk, automate

  • Load testing and capacity planning
  • Budgets and a cost-per-active-user model
  • Security regression workflow
  • Documentation that gets used: debug map, runbooks